20454519-Tee-JICORB-25-x-25.1309.3-1

Short Description:

The company is a world-leading manufacturer of high-pressure water jet pumps. 
The SL-VI 50HP pump is a highly classic and popular industrial high-pressure pump.
We offer original accessories and professional technical support.  


    
                  

Details

English Translation of Title:
Tee Fitting for Water Jet Cutting Machine Parts – JIC to ORB, 25 x 25, Model No. 20454519-Tee-JICORB-25-x-25.1309.3-1

Introduction, Application, Features, and Maintenance:

This component is a tee fitting designed for water jet cutting systems. It combines JIC (Joint Industry Council) and ORB (O-Ring Boss) connection standards, both with a 25 mm nominal size, allowing flow to be split or merged while accommodating different port types.

Application:
Used to divide or merge high-pressure water or abrasive slurry flow in water jet cutting machines. Typical installations include connecting multiple cutting heads from a single pump, combining return lines, or integrating pressure sensors and bypass circuits where JIC-to-ORB transitions are required.

Features:

  • Rated for extreme pressures common in water jet cutting, up to 6,000 bar (87,000 psi).

  • Tee configuration allows 90-degree branch flow from the main line.

  • Converts between JIC (flared seat) and ORB (O-ring sealed) connection standards.

  • All ports feature 25 mm nominal size.

  • Manufactured from high-strength, corrosion-resistant material suitable for abrasive water jet media.

  • Precision-machined sealing surfaces ensure leak-free operation.

Maintenance:

  • Regularly inspect the tee body, threads, O-ring seat, and flared sealing surface for signs of erosion, cracking, or thread damage.

  • Check the O-ring (if present) for hardening, cracking, or deformation.

  • Check for leakage at all three connection points during machine operation.

  • Replace immediately if any surface pitting, thread damage, or leakage is detected.

  • Always use a new O-ring when reassembling the ORB connection.

  • Inspect the JIC flare surface for scratches or damage that could compromise sealing.

  • Follow specified torque values for all three connections.


INQUIRY




Leave Your Message